top of page

Richfield, UT

I-70 & SR-120

Concrete Cutting / Highway and Airport Services / Demolition / Concrete Pouring / Transportation

rich2.jpg

A-Core in partnership with UDOT is performing pavement restoration on Interstate 70 from Richfield to Joseph, Utah, and State Road 120 from 640 North to 1300 South in Richfield, Utah.  The concrete panels that have cracked, sunk, or show other signs of corrosion, will be replaced. This method of replacing individual panels is a cost-effective way to maintain the safety and integrity of the road. 

483 panels will be replaced. Lane restrictions will be in effect for both east and west lanes bounds on Interstate 70 and north and south bound lanes on State Road 120 in Richfield

rich1.jpg
24476b3852e3ab104afc03becfc6663c61a33d68.jpg
5d62baa849c79df9064fd1446a0174100bde3a1e.jpg

News & Updates

c29777cbd86e635ccd11e24bb4cc3f977d5d48d9.png

What is Concrete Grinding?

Concrete grinding is the process of smoothing rough concrete surfaces...

NEWS & UPDATES

3af8c3d84b1a3a692874b276e84e38b4d7ebf33c.png

Concrete Removal

No one likes having broken, cracking, and crumbling concrete on their property...

466b38edd6879226a4e52c686beffa428b1bb1cf.png

What is Concrete Wire Sawing?

Concrete wire sawing is a versatile and effective concrete sawing tool...

bottom of page